Square Butte

United States flagUnited States
In ServiceLine
https://www.hitachienergy.com/ch/fr/news-and-events/customer-success-stories/square-butte

https://www.hitachienergy.com/ch/fr/news-and-events/customer-success-stories/square-butte

© Hitachi

Wayback Machine

Wayback Machine

© Cigre

CU (power line) - Wikipedia

CU (power line) - Wikipedia

© Wikipedia

1 / 3

Key Specifications

Power Rating
500 MW
DC Voltage
±250 kV

Transmission Distances

Total Transmission
749 km
Onshore
0 km
Offshore
0 km
Overhead
749 km

Quick Facts

Status
In Service
Type
Line
Countries
United States
Power
500 MW
Voltage
±250 kV
Distance
749 km

HVDC World Premium

Full project intelligence for 750+ HVDC projects worldwide.

  • Full project data & specs
  • Interactive route maps
  • Industry analysis & charts
  • Cost & financial data
  • Stakeholder tracking
Upgrade to PremiumContact us for pricing
Total Project Cost
€2.8B
Cost per MW
€1.4M
Cable Length
1,468 km
Commissioned
2024

Project Cost Breakdown

Converter Stations38%
Cable Systems41%
Overhead Lines (OHL)9%
Misc12%

Annual Power Transfer (TWh)

Route Map & Cable Elevation Profile

Premium Access

Unlock timelines, costs, stakeholders, cable specs, power flow charts, and interactive maps for all 750+ projects.

Upgrade to Premiumor contact us for pricing